What were the constraints?


An obsolete existing system: working on an old system required customised solutions, as no standard options were available.
Mandatory optimisation: to avoid our customer having to rebuild the entire circuit, with all the associated costs and delays.
Complex access and handling: small workspaces with difficult access required specific logistics and know-how for manoeuvres.
Tight schedule: meet expectations within a tight timeframe without compromising quality or safety.

Our solution:
Tailor-made study and design to create adaptor flanges that are perfectly compatible with the existing structure.
Exemplary coordination between the engineering, site and logistics teams to overcome access and handling constraints.
Rigour and responsiveness to maintain the schedule while guaranteeing optimum performance.

This project highlights our ability to rise to major technical and organisational challenges, offering tailored, reliable and innovative solutions to meet the specific needs of our customers.

A huge well done to our teams for their expertise and exemplary commitment! 
And a big thank you to our customer for their confidence in us for this ambitious project.

Do you have a complex technical project? We're here to help. 

 